Design of Active Travel Corridor from Kilmarnock to Lugton (RIBA Stages 0-2)
East Ayrshire Council · Awarded contract
AwardedDesign of Active Travel Corridor from Kilmarnock to Lugton (RIBA Stages 0-2)
Awarded Unknown
AwardedNot specified
Value£165,190.00
SupplierSweco UK Limited
AgencyEast Ayrshire Council
RegionScotland
CategoryInfrastructure
About
East Ayrshire Council awarded a contract to Sweco UK Limited for the design of an active travel corridor between Kilmarnock and Lugton, covering RIBA Stages 0-2 under the Sustrans Places for Everyone funding programme.
The contract value is £165,190.
Similar open tenders12
TenderCloses
Bagillt to Greenfield Active Travel Route ConstructionInfrastructure
09 Dec 2026
Mold Road Active Travel Scheme Phase 1a & 1b — Improvements to Mold Road and Regent Street (Plas Coch roundabout to city centre)Infrastructure
21 Dec 2026
Douglas Valley Outdoor Recreation Market Research, Branding, Website & Wayfinding – South Lanarkshire CouncilConsultancy & Legal
15 Dec 2026
Design Team Services for North Lochs Community Hall Redevelopment, LeurbostConstruction
18 Dec 2026
North York Moors Esk Valley Active Travel Feasibility Study – Accessibility and Active Travel Audit of Railway Stations and SchoolsTransport & Logistics
29 Nov 2026
Active Travel Infrastructure Construction — Ashgrove Connects Initial WorksInfrastructure
14 Dec 2026
Consultancy Services for Hillingdon Circus Junction Movement and Public Realm Strategy – HillingdonConsultancy & Legal
06 Jan 2027
A38 Segregated Cycle Route Construction – Selly Oak to Longbridge (4.95 km)Infrastructure
18 Dec 2026
Lead Designer & Multidisciplinary Team for Carrick-a-Rede Visitor Infrastructure Capital Works – National Trust NIInfrastructure
02 Dec 2026
Delivery and Operation of Closed Road Cycle Circuit – Leckwith, CardiffConstruction
23 Dec 2026
Design & Build New Housing — Rockfield Road (Phase 2), Tobermory, Isle of MullConstruction
08 Jan 2027
Design of Public Realm to RIBA Stage 3 for Camden High Street PedestrianisationInfrastructure
27 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Design of Crosshouse to Kilmarnock Active Travel Route (Stages 0-2)InfrastructureSweco UK Limited
$130,000
Design of Active Travel Route from Ayr to Girvan (Culzean Way) – Stages 0-1InfrastructureSweco UK Limited
$172,245
Concept Design Stage 2 for Prestwick to Barassie Active Travel RouteInfrastructureSweco
$181,716
Consultancy for Review of Active Travel Routes and Infrastructure in East AyrshireConsultancy & LegalSweco UK Limited
$67,795
Award of Kilmarnock Green Infinity Loop Design (RIBA Stages 3 & 4) to Sweco UK LimitedInfrastructureSweco UK Limited
$1,280,533.21
Consultancy Support for Levelling Up Fund Active Travel Corridor ApplicationConsultancy & LegalSweco UK Limited
$65,800
Consultancy Services for Active Travel and Safer Routes to School Projects in East AyrshireConsultancy & LegalSweco UK Limited
$95,445.38
Concept Design for Annick Valley Active Travel Route Stage 2InfrastructureStantec UK Limited
$146,379.22
Design of Lochgilphead Active Travel Route and Streetscape ImprovementsInfrastructureCivic Engineers
$116,305
Development of Local Transport & Active Travel Strategy and Street Design Guide for North Ayrshire CouncilConsultancy & LegalArcadis Consulting (UK) Limited
$105,558
Concept Design for Campbeltown Esplanade and Kinloch Park Active Travel RouteConsultancy & LegalConnected Transport Planning
$79,960
Active Travel Corridor Review for B767 Road Between Eaglesham and ClarkstonInfrastructureAECOM
$17,952.56
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





