Tender: Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)
Released 12 days ago
About
Blackdown Hills National Landscape (BHNL) is seeking a supplier to deliver detailed design and assessment work including: Lot 1 — detailed designs for two River Wolf weir modifications at Marles Weir (near Awliscombe, Honiton) and Weston Weir (Heron's Farm, near Honiton), with the River Wolf flowing into the River Otter; Lot 2 — Flood Risk Assessment preparation and progression to detailed design to improve flood resilience at the Hele Railway Crossing on the western mainline across three sites (Smithincott Extension, Spratcot Site Cullompton, and the Sheldon Catchment) as part of the Connecting the Culm FlooR3 Extension Project; and Lot 3 — a capital water quality outfall programme commissioning specialist consultants, overseen by a Project Steering Group, to deliver two water-quality-focused strands across the South West of England (excluding Gloucestershire and Bath/Bristol).
Similar open tenders11
Similar awarded contracts12
Likely value £140K to £480KAgency spend history
Devon County CouncilContract size
What Devon County Council has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





