Tender: Building Management System Design, Supply and Installation for Canley Brook, Burton Green and Stoneleigh Pumping Stations (HS2 MEICA)
Released 3 days ago
About
Supplier needed for the two-stage delivery of a complete Building Management System (BMS) covering design, supply, configuration, integration, testing and installation for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. Each site will receive a centralised BMS comprising a dedicated panel with dual-redundant PLCs, HMIs, remote interface enclosures, a dedicated BMS LAN and distributed interface enclosures in plant rooms to enable communications with plant systems and connectivity to the HS2 Network Integrated Control Centre (NICC). The BMS will integrate mechanical and electrical building services to provide monitoring, control, alarm management and operator interfaces for the pumping stations and portal building, with graphical visualisation and coverage for HVAC, LV distribution and metering, UPS, lighting, fire alarms, public health services, pumped drainage and disabled toilet alarms. The scope also includes reviewing design inputs, updating the Functional Design Specification and generic drawings, coordinating all mechanical and electrical interfaces for full integration, and an assessment of cyber security risks for the BMS by Sella Controls.
Similar open tenders11
Similar awarded contracts12
Likely value £300K to £2.8MAgency spend history
V V B Engineering (UK) LtdContract size
What V V B Engineering (UK) Ltd has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





