Tender: Controlled Demolition of B55 Office Complex and B55.2 Turbine Hall – Sellafield (WAGR)
Released 17 days ago
About
A2R JV is seeking a supplier for the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall within the WAGR complex at Sellafield, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works; retained basements and associated structures also require protection. Uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning, with the overall intent to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme.
Similar open tenders10
Similar awarded contracts12
Likely value £1.0M to £11.0MAgency spend history
Altrad AtkinsRealis Joint Venture (A2R JV)Contract size
What Altrad AtkinsRealis Joint Venture (A2R JV) has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





