Open

Tender: Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)

Released 3 days ago

Closes07 Jan 2027
Likely valueEstimate£500K to £4.5MInflation adjusted
LocationNorth West
SourceFind a Tender
CategoryInfrastructure
45 days leftCloses Thu, 7 Jan 2027

The Authority is seeking a contractor to design and build a new 34 metre, two-span footbridge over the South Tyne River along Public Right of Way 302146 near Dryburn by Garrigill in Alston parish. The bridge must provide a minimum 1.2 m walking width and include a pier design suitable for the frequent flash flooding that caused the previous structure to fail. The crossing forms part of the Pennine Way National Trail and works must meet National Trails Quality Standards. The project will be delivered as a two-stage Design and Build contract with the contractor responsible for completing the full design and obtaining all necessary consents, permits and orders (Stage 1) to enable construction (Stage 2) to begin as soon as possible after 1 April 2028 (subject to funding), and, where required, making best use of the in-river working window from 16 June to 30 September.

Similar open tenders7

Similar awarded contracts12

Likely value £500K to £4.5M

Agency spend history

Westmorland and Furness Council

What Westmorland and Furness Council has spent, year by year and by contract size, and who won the work.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month