Tender: Design and Manufacture of 3-Phase 415Vac 4-Way Power Distribution Unit (PDU29)
Released 4 days ago
Closes01 Dec 2026
Likely valueEstimate£60K to £160KInflation adjusted
LocationUnited Kingdom
SourceContracts Finder
CategoryManufacturing & Industrial
8 days leftCloses Tue, 1 Dec 2026
About
A supplier is sought to complete the detailed design, manufacture and delivery of a new 3-phase 415Vac Power Distribution Unit (PDU29) with one incoming and four outgoing ways, to be housed in an LV switchroom with the incoming transformer pen situated just outside.
Similar open tenders5
TenderCloses
Replacement Air Circuit Breakers and Retrofit Equipment for 660V & 415V Switchboards on MPV Jura and MPV HirtaManufacturing & Industrial
14 Dec 2026
Replacement Modular 1200 kVA Three-Phase AC Magnet Power Supply for ISIS Neutron and Muon SourceManufacturing & Industrial
23 Nov 2026
Inspection and Testing of High- and Low-Voltage Switchgear – Cardiff and Vale University Health Board (UHW, UHL, Barry Hospital, Woodland House, Genomics)Infrastructure
23 Nov 2026
Transformer Diagnostic Testing and Condition Assessment Services – UKAEAInfrastructure
27 Nov 2026
Similar awarded contracts12
Likely value £60K to £160KContract and supplierAwarded value
Supply of Mains Distribution Units (MDUs) to the Ministry of DefenceDefense & AerospaceRELAY ENGINEERING LIMITED
£42,800
Supply and Delivery of 40kVA UPS Kiosk for NATO EC&I Project at OFD ThanckesEnergy & EnvironmentUPS Systems plc
£62,387
Supply and Delivery of Low Voltage Switchboard for Daresbury Laboratory Plant Room 2Manufacturing & IndustrialTES (NI) Ltd
£116,300
Supply and Installation of LV Switchgear Control Panel for UPS System at CPI SedgefieldEnergy & EnvironmentFEG Ltd
£112,389
Agency spend history
UK Atomic Energy AuthorityYearlyQuarterly
0
Contract size
Under $100K
$100K to $1M
$1M to $10M
$10M to $100M
$100M and over
What UK Atomic Energy Authority has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open manufacturing and industrial tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





