River Restoration and Bridge Replacement on Burdiehouse Burn
Edinburgh and Lothian Greenspace Trust · Awarded contract
AwardedRiver Restoration and Bridge Replacement on Burdiehouse Burn
Awarded Unknown
About
Edinburgh and Lothian Greenspace Trust awarded a contract to Mclaren Plant Ltd.
for river restoration work on the Burdiehouse Burn, including associated path works and bridge replacement.
Similar open tenders12
TenderCloses
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
2026 Structural Replacement and Repair Works to Bridges – Citizen (£240,000, 6-month contract)Infrastructure
11 Dec 2026
Construction of Newhailes Gardeners Learning and Community Hub – Musselburgh, East LothianConstruction
10 Dec 2026
Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)Energy & Environment
30 Nov 2026
Replacement of Brick, Blockwork and Cladding under M6 Highgill Motorway Bridge (Lune Gorge)Infrastructure
27 Nov 2026
Construction of 1.75ha Currynierin Community Park with Inclusive Play Facility – Waterside, Derry/LondonderryConstruction
04 Dec 2026
Framework Agreement for Drainage Civil Engineering Works – East Dunbartonshire CouncilWater & Sanitation
11 Dec 2026
Flooding and Drainage Engineering Services Framework – Falkirk Council (2027–2031)Water & Sanitation
30 Nov 2026
DfI Rivers Inspection and Maintenance Framework for Culverts and Underground Infrastructure – Greater Belfast; Coleraine, Omagh & Fermanagh; Armagh & LisburnWater & Sanitation
18 Dec 2026
Access, Landscaping and Drainage Improvements at Acle Bridge Toilet Block – Broads AuthorityConstruction
03 Dec 2026
Train Wood Greenspace Infrastructure Works – Design, Flood Risk Permit Support, Resurfacing, Footbridge, Pond and Platform Installations (Norwich)Infrastructure
06 Jan 2027
Design and Construction of Horse Fen & Somerton South Pumping Stations and Somerton Culvert – Upper Thurne Package 3Water & Sanitation
19 Jan 2027
Other similar contracts12
Contract and supplierAwarded value
Concept Design for Restoration of Burdiehouse Burn and Surrounding LandscapesEnergy & Environmentcbec eco-engineering UK
$0
Remeandering of Dundonald Burn for Biodiversity and Flood ManagementEnergy & EnvironmentMAM Contracting Limited
$0
Feasibility and Concept Design for Dargavel Burn Restoration and Weir RemovalConsultancy & LegalFairhurst
$0
A70 Glenbuck Realignment and Bridge Replacement by R J McLeodInfrastructureR J McLeod
$2,059,130
Design of River Leven Boardwalks and Platforms at Burn Mill GardenInfrastructurePlincke Landscape LTD
$23,800
Brerachan Water Restoration Project Awarded to McGowan Environmental EngineeringWater & SanitationMcGowan Environmental Engineering Ltd
$71,988
Replacement of Skolie Burn Bridge by RJ McLeod for West Lothian CouncilInfrastructureRJ McLeod (Contractors) Ltd
$1,734,760
Environmental Improvement Works on Bridge Street, BanffInfrastructureHunter Construction (Aberdeen) limited
$0
Construction of Roseburn to Union Canal Active Travel Route and Greenspace ImprovementsInfrastructureBalfour Beatty Civil Engineering Ltd
$12,559,219
Refurbishment of Kirkhill Drive Bridge by Aberdeen Marine LtdInfrastructureAberdeen Marine Ltd
$170,750
Construction of Two New Footbridges on West Highland Way Near Conic HillInfrastructureMclaren Plant Ltd.
$0
Removal of Bronie Burn Weir and Channel Restoration by McGowan Environmental EngineeringWater & SanitationMcGowan Environmental Engineering Ltd
$0
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far





