The Scottish Environment Protection Agency awarded a contract to HaskoningDHV UK Ltd for the development of technical design and groundworks supervision and management for the removal of Halter Burn Weir.
The contract value was £99,992.
Similar open tenders12
TenderCloses
Blackdown Hills Green Finance Accelerator – River Wolf Weir Modifications, Floodplain Reconnection Designs and High‑Risk Water Quality Outfalls (South West England)Energy & Environment
30 Nov 2026
Design and Construction of Horse Fen & Somerton South Pumping Stations and Somerton Culvert – Upper Thurne Package 3Water & Sanitation
19 Jan 2027
Floodplain Reconnection, Weir Modification and High-Risk Water Quality Outfall Outline Designs — Blackdown Hills Green Finance AcceleratorEnergy & Environment
30 Nov 2026
Design and Build 34m Replacement Footbridge over South Tyne River – Dryburn (near Garrigill, Alston Parish)Infrastructure
07 Jan 2027
DfI River Directorate Framework for Watercourse Maintenance – Riverbank, Flood Defence & Aquatic Weed ControlInfrastructure
10 Dec 2026
RSPB Cymru Peatland Restoration – Berwyn SSSI (south of Llangollen) 2026–2027Energy & Environment
30 Nov 2026
Design & Integration Partner for 'Only Rainwater into Windermere' (ORiW) Programme – Windermere Water Quality InfrastructureWater & Sanitation
30 Nov 2026
Natural Flood Management Works – Leaky Dams & Overland Flow Management, WatlingtonEnergy & Environment
23 Nov 2026
Inspection and Maintenance of Underground Culverts Framework – Greater Belfast, Coleraine/Omagh/Fermanagh & Armagh/LisburnWater & Sanitation
18 Dec 2026
Construction of 1.75ha Currynierin Community Park with Inclusive Play Facility – Waterside, Derry/LondonderryConstruction
04 Dec 2026
Demolition, Design and Construction of Howard's Lane Public Toilets – Wareham, DorsetConstruction
15 Jan 2027
Servicing, Maintenance and Reactive Repair of Sprinklers, Gas Suppression, Dry Risers and Fire Hydrants – East Renfrewshire Council (2027–2029)Public Safety & Security
23 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Topographic Surveys and Concept Design for Weir Removal at Halter BurnWater & SanitationRoyal HaskoningDHV
$0
Design and Groundworks Supervision at Craighead Mill WeirWater & SanitationHaskoningDHV UK Ltd
$134,394
Design and Supervision of Gottar Water Weir for River RestorationWater & SanitationRoyal HaskoningDHV
$0
Tidal Weir Design and Consultancy Support Awarded to HaskoningDHV UKConsultancy & LegalHaskoningDHV UK Limited
$201,326
Feasibility and Concept Design for Dargavel Burn Restoration and Weir RemovalConsultancy & LegalFairhurst
$0
Detailed Design for River Oughton Collapsed Weir Removal and Habitat EnhancementWater & SanitationFishtek Consulting
$79,608
Design and Build of Halsewater Weir under Small Works Package Wessex H&TWater & SanitationLand & Water
$108,464.88
Removal of Bronie Burn Weir and Channel Restoration by McGowan Environmental EngineeringWater & SanitationMcGowan Environmental Engineering Ltd
$0
Outline Design for Weir Removal/Enhancement to Improve Fish PassageEnergy & EnvironmentJBA Consulting
$99,339.61
Assessment and Project Development for Removal of Keybridge Weir on De Lank RiverEnergy & EnvironmentFishtek Consulting
$11,238
Concept Design and Feasibility Study for Fish Passage at Montgarrie WeirConsultancy & LegalHaskoning UK Ltd
$172,567
Feasibility Studies for Bowston Weir Removal and River Kent RestorationEnergy & EnvironmentSouth Cumbria Rivers Trust
$30,000
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then £36/GBP per month
Revenue from government work£312K won so far